Governments publish thousands of decisions every day: permits, tenders, company changes, planning approvals. Almost none of it can be queried. Hito Signal reads it, structures it and tells you what changed.
Every country publishes. Almost nobody can query it.
Gazettes, registries and procurement portals, each with its own format and language, mostly as PDFs. Our engine finds each document, extracts the facts, links them to companies and assets, and keeps the source for every field.
We start where the signal is strongest: energy in Spain.
In 2025, 40 GW of grid access was requested in Spain and 4.5 GW approved. Who gets to build, and where, is decided in resolutions published in the official gazettes. Hito Signal Energy turns them into a feed.
View40.42°N 3.70°W
Scroll to zoom in · drag to turn
Signals on the globe are examples of what the engine detects. Live today: energy permits in Spain. Projects shown over Spain are real.
Every renewable permit in Spain, structured the day it's published.
Hito Signal Energy collects authorisations, refusals, lapses and grid-access tenders from Spain's official gazettes and turns them into clean English data you can query, join and automate on.
Projects shown are real BOE resolutions. The network is stylised.
From gazette to signal
What happens to one real resolution between the BOE publishing it and your team getting the alert.
Read
Every morning we read the full BOE and keep the energy resolutions.
Extract
The decision, promoter, project, capacity, permits and location are identified in the Spanish legal text.
Structure
Each fact becomes a clean English field, linked to the source document.
Deliver
The event joins the feed and triggers the alerts you've set up.
BOLETÍN OFICIAL DEL ESTADO20 de marzo de 2026
III. Otras disposiciones
MINISTERIO PARA LA TRANSICIÓN ECOLÓGICA Y EL RETO DEMOGRÁFICO
6533 Resolución de 4 de marzo de 2026, de la Dirección General de Política Energética y Minas, por la que se desestima la solicitud de Shell Desarrollo 3, SLU, de autorización administrativa previa, autorización administrativa de construcción y declaración, en concreto, de utilidad pública de la instalación fotovoltaica BCN Solar 1, de 115,12 MW de potencia instalada, y de su infraestructura de evacuación.
…y su infraestructura de evacuación, en las provincias de Lleida y Tarragona (en adelante, el proyecto).
Event recordBOE-A-2026-6533
event_typeauthorization_denied
promoterShell Desarrollo 3, SLU
permit_typesAAP, AAC, DUP
project_nameBCN Solar 1
capacity_mw115.12
regionCataluña
technologysolar_pv
Permitting eventsUpdated today
2026-03-20BCN Solar 1Shell Desarrollo 3115.1 MWDenied
BCN Solar 1 was denied. 115 MW of solar won't go ahead in Lleida and Tarragona.
Alert: Cataluña, solar, 50 MW and above
The resolution text is quoted from BOE-A-2026-6533.
When a project falls, capacity comes back
Every refusal, lapse or withdrawal can free grid capacity. We flag it the day it's published, so you see it before the market does.
Node view: projects sharing one busbar
EnergisedBreaker openProposed
Volateo Solar, Olmazo and BCN Solar 1 are real BOE resolutions. The storage project and the shared busbar are illustrative.BOE-A-2023-11177 · BOE-A-2024-435 · BOE-A-2026-6533
What's in the feed
Four datasets built from the same official sources, each row linked to the document it came from.
Permitting events
Every authorisation, refusal, lapse, withdrawal, environmental assessment and public consultation, with stage, technology, capacity, promoter and location.
BCN Solar 1 denied115.12 MW, Lleida and Tarragona, 20 March 2026
Project pipeline
One row per project with its furthest stage and current status, so you can tell what is moving from what has stalled.
Olmazo17.7 MW, construction authorisation granted
Released capacity
Refusals, lapses and withdrawals flagged the day they're published. Each one can free capacity at a grid node.
115 MW back on the tableafter the BCN Solar 1 refusal
Grid nodes
Projects linked to the substation they connect to. Screen a node before you file an access request.
SET Haza del Sol 30/220 kVOlmazo and the projects sharing its connection
Ownership changes Coming
Changes of holder and of directors in project companies. Often the first sign that a project has been sold.
Olmazo SPV, S.L.new holder of the Olmazo authorisations
Use it where your data already lives
The same schema across every delivery method. Pick the one your team already uses.
REST APIFilter by date, stage, technology, region, node or promoter.
WebhooksA call to your system when a matching event is published.
SnowflakeA secure data share you query next to your own tables.
AI agentsAn MCP server so your assistants can query the feed directly.
Files and emailDaily CSV and Excel files and a weekly summary.
# Projects of 50 MW or more refused or lapsed since 1 November
curl https://api.hitosignal.com/v1/events \
-H "Authorization: Bearer $HITO_KEY" \
-G \
-d event_type=authorization_denied,authorization_lapsed \
-d min_capacity_mw=50 \
-d since=2026-11-01
import requests
r = requests.get(
"https://api.hitosignal.com/v1/projects",
headers={"Authorization": f"Bearer {KEY}"},
params={
"technology": "storage",
"furthest_stage": "construction_authorization",
"region": "Andalucía",
},
)
for p in r.json()["data"]:
print(p["project_name"], p["capacity_mw"], p["grid_node"])
-- Capacity released per node over the last six monthsSELECT grid_node,
SUM(capacity_mw) AS released_mw,
COUNT(*) AS projects
FROM HITO.ENERGY.RELEASED_CAPACITY_SIGNALS
WHERE publication_date >= DATEADD('month', -6, CURRENT_DATE)
GROUP BY grid_node
ORDER BY released_mw DESC;
Which projects are reaching ready-to-build, who holds them and which portfolios are stalling?
Project pipeline, changes of holder, full history for due diligence
Storage and solar developers
Where is grid capacity coming back, and what are competitors filing?
Released capacity by node, events by promoter, tender alerts
Data-centre developers
Which substations are crowded, which are freeing up, and which projects sit next to them?
Grid nodes, nearby storage and solar projects, demand-access tenders
Manufacturers and EPCs
Which projects are about to order panels, inverters, batteries and transformers?
Projects reaching construction authorisation, with promoter and size
Banks and advisors
What is the real permitting status of the assets in a deal or a loan book?
Event history with links to every official document
One engine for every public record
Energy in Spain is the first signal set. The same engine reads any official source: it finds the document, pulls out the facts, links them to the right company and asset, and tells you what changed.
Signal sets
Pick one to see which sources feed it.
Energy · Spain
Live
Permits, refusals, lapses, environmental assessments and grid-access tenders
BOE, fifteen regional gazettes and Red Eléctrica's grid-capacity maps today; Cantabria and Canarias next
Public procurement · Spain
Next
Tenders, awards and contract changes, linked to the bidding companies
Plataforma de Contratación del Sector Público
Companies and ownership · Spain
Live
Directors, shareholders, mergers and insolvency notices for every project company
BORME, the Mercantile Registry gazette, linked to each project's promoter
Planning and real estate
Planned
Rezonings, large building licences and land for data centres and logistics
Regional and municipal gazettes
Portugal and Italy
Later
The same signals, the same schema, the same API
Diário da República, Gazzetta Ufficiale
Founding customers decide which signal set we open next.
Every public source, wired to one line
Gazettes, notice boards, registries and the grid operator, read every morning and resolved into one record per project. A closed switch means it is in the feed today. The rest is the map we are wiring next.
Live
19
Connecting
2
On the map
3
Hito engine19 feeds live · one record per project · every morning
Prices in euros, before VAT. Every plan starts with the free 2025 dataset.
Common questions
7 questions
Something else? Write to hello@hitosignal.com. A person answers, usually the same day.
From Spain's official gazettes: the Boletín Oficial del Estado (BOE) for state-level projects above 50 MW, and the regional gazettes for everything smaller: fifteen of the seventeen regions today, from Castilla-La Mancha (DOCM and the Junta's notice board), Andalucía, Castilla y León, Aragón and Cataluña to Madrid, Navarra, the País Vasco, the Balearic Islands, Asturias, La Rioja and Murcia. Cantabria and the Canary Islands are next. Every record links to the original document.
The same day. The gazettes publish each morning, and new events reach the API, webhooks and Snowflake share that day.
It's public and legally reusable, but scattered across 18 gazettes as Spanish legal PDFs. We read, structure, translate and link it so your team doesn't have to.
Those are authorised by the regions, so they never reach the BOE. Fifteen of the seventeen regions are live. Since January 2025 they add about 2,500 renewable projects, some 22 GW, that appear only in the regional gazettes, almost all of them 50 MW or less and many under 5 MW. Cantabria and the Canary Islands are next.
No. We structure information about projects and companies only. Annexes listing affected landowners are never extracted.
No. Energy in Spain is the first signal set because demand is urgent and the sources are rich. Procurement and company ownership come next, on the same engine and API.
Yes. Download the full 2025 dataset for free and ask us for a trial API key.